Search
Displaying 761 - 770 of 2166
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/L_Spill%20Prevention%2C%20Control%2C%20and%20Countermeasure%20%28SPCC%29%20Plan.pdf
APPENDIX L Draft Spill Prevention Control and Countermeasure Plan Amanda Moore Project Manager Bureau of Land Management, California Desert District Department of the Interior, Regions 8 & 10 The attached Draft Spill Prevention Control and Countermeasure (SPCC) Plan (Plan) has been prepared for the Sapphire Solar Project. The Plan includes project information, the types of chemicals, fuels,…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/M_Hazardous%20Materials%20Business%20Plan%20%28HMBP%29.pdf
APPENDIX M Hazardous Materials Business Plan Hazardous Materials Business Plan Sapphire Solar Project JUNE 2023 Prepared for: SAPPHIRE SOLAR, LLC/EDF RENEWABLES DEVELOPMENT, INC. 15445 Innovation Drive San Diego, California 92128 Contact: Katie Kuplevich Prepared by: 78-075 Main Street, Suite G-203 La Quinta, California 92253 DUDEK DUDEK.COM Printed on 30% post-consumer recycled material. 13459 i…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/N_Construction%20Waste%20Management%20and%20Recycling%20Plan.pdf
APPENDIX N Construction Waste Management and Recycling Plan Construction Waste Management and Recycling Plan Sapphire Solar Project FEBRUARY 2023 Prepared for: SAPPHIRE SOLAR, LLC/EDF RENEWABLES 15445 Innovation Drive San Diego, California 92128 Contact: Katie Kuplevich Prepared by: 605 Third Street Encinitas, California 92024 DUDEK DUDEK.COM Printed on 30% post-consumer recycled material. 13459…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/O_Fire%20Protection%20and%20Safety%20Plan.pdf
APPENDIX O Fire Prevention and Safety Plan Fire Prevention and Safety Plan Sapphire Solar Project FEBRUARY 2023 Prepared for: SAPPHIRE SOLAR, LLC 15445 Innovation Drive San Diego, California 92128 Prepared by: 78-075 Main Street, Suite G-203 La Quinta, California 92253 Contact: Michael Huff DUDEK DUDEK.COM Printed on 30% post-consumer recycled material. 13459 i FEBRUARY 2023 Table of Contents…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/P_Hydrology%2C%20Hydraulics%2C%20and%20Water%20Quality%20Report.pdf
APPENDIX P Hydrology, Hydraulics, and Water Quality Technical Study DRAFT Hydrology, Hydraulics, and Water Quality Technical Study Sapphire Solar Project Riverside County, California FEBRUARY 2023 Prepared for: SAPPHIRE SOLAR, LLC Prepared by: 605 Third Street Encinitas, California 92024 __________________________ Kipp Vilker PE No. 90011 QSD No. 27048 Civil Engineer DUDEK Printed on 30% post…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/Q_Noise%20Report.pdf
APPENDIX Q Noise Technical Report Noise Technical Report Sapphire Solar Project Riverside County APRIL 2024 Prepared for: SAPPHIRE SOLAR, LLC/EDF RENEWABLES DEVELOPMENT, INC. 15445 Innovation Drive San Diego, California 92128 Contact: Katie Kuplevich Prepared by: 78-075 Main Street Suite G-203 La Quinta, California 92253 Contact: Jonathan V. Leech, INCE DUDEK DUDEK.COM Printed on 30% post…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/R_Paleontological%20Resource%20Survey%20Report.pdf
APPENDIX R Paleontological Resource Survey Report PALEONTOLOGICAL RESOURCE SURVEY REPORT FOR THE SAPPHIRE SOLAR PROJECT, RIVERSIDE COUNTY, CALIFORNIA September 2023 -::rPALEOWEST PALEONTOLOGICAL RESOURCE SURVEY REPORT FOR THE SAPPHIRE SOLAR PROJECT, RIVERSIDE COUNTY, CALIFORNIA Prepared by: Jessica DeBusk, B.S., MBA Ben Scherzer, M.S. Heather Clifford, M.S. Prepared for: U.S. Department of the…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/S_MMRP.pdf
APPENDIX S Mitigation Monitoring and Reporting Program Sapphire Solar Project Appendix S. Mitigation Monitoring and Reporting Program November 2024 S-1 Draft EIR Mitigation Monitoring and Reporting Program Introduction California Public Resources Code Section 21081.6 requires that, upon certification of an EIR, “the public agency shall adopt a reporting or monitoring program for the changes made…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/T_RTCs.pdf
APPENDIX T Responses to Comments Sapphire Solar Project Appendix T. Comments and Response to Comments November 2024 T-1 Final EIR Comments and Response to Comments 1. INTRODUCTION TO COMMENTS AND RESPONSES APPENDIX The Final Environmental Impact Report (EIR) includes the Sapphire Solar Project Draft EIR (August 2024) as revised, comments received on the Draft EIR, and responses to those comments.…
https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/CUP220035.PUP220002.AG%20Dim.DA-Final%20EIR%20for%20Sapphire%20Solar%20Project.pdf
FINAL ENVIRONMENTAL IMPACT REPORT Sapphire Solar Project NOVEMBER 2024 Lead Agency: County of Riverside 4080 Lemon Street, 12th Floor Riverside, California 92501 Contact: Timothy Wheeler Prepared by: 605 Third Street Encinitas, California 92024 Contact: Chelsea Ohanesian Printed on 30% post-consumer recycled material. Sapphire Solar Project Table of Contents November 2024 TOC-i Final EIR Table of…