Notice of Preparation (NOP) for Barker Logistics - PPT190008
Planning Navigation
Notice of Preparation (NOP) for Barker Logistics

Notice of Preparation (NOP) for an Environmental Impact Report (EIR) for Plot Plan No. 190008 (PPT190008) Barker Logistics

See the following links to access documents related to the NOP:

Comment Period


The comment period for the Notice of Preparation is from September 20, 2019 to October 29, 2019.

Scoping Session


A public scoping session will be held to accept comments from responsible agencies and the public about the scope and content of the EIR on Monday October 7, 2019, at 1:30 pm, at 4080 Lemon Street, 1st Floor, Conference Room 2A, Riverside, CA 92501

Project Information


PROJECT SUMMARY:
The Project involves a Plot Plan to allow development of a 694,540- square foot, logistics/warehouse building with a height ranging from 43 feet to a peak of 49.5 feet with paved surface parking for 382 automobiles and 86 trucks/truck trailers on a 30.19-acre property. The building dimensions are 43 feet to a peak of 49.5 feet in height, 1,098 feet long, and 720 feet at its widest. It is 600 feet from dock doors on the west to the dock doors on the east of the structure. The automobile parking spaces are to be located around the perimeter of the building; 109 truck/truck trailer bays will be located on the east and west elevations of the building. Three vehicular access points are proposed – two onto the Project site from an extension of Walnut Street that would border the Project site to the north and one onto the Project site from Placentia Avenue in the southeast corner of the Project site. Additional project details are included within the initial study prepared for the NOP.

PROJECT LOCATION:
The proposed project is located north of Placentia Avenue, east of Patterson Avenue, west of Harvill Avenue, and south of Walnut Street.
 

Contact Information


Russell Brady, Contract Planner

Riverside County Planning Department
4080 Lemon St., 12th Floor
Riverside, CA  92501
(951) 955-3025

rbrady@rivco.org 

Comment Period

 

The comment period for the Notice of Preparation is from July 3, 2017 to August 2, 2017.

Comment Period

 

The comment period for the Notice of Preparation is from July 3, 2017 to August 2, 2017.

 

Project Information