EIR No. 534 - San Gorgonio Crossing
Field level help.
Planning Navigation
Environmental Impact Report (EIR) No. 534

Notice

 

San Gorgonio Crossings, Final Environmental Impact Report No. 534, General Plan Amendment No. 1079, Change of Zone No. 7799, Plot Plan No. 25337, Parcel Map No. 36564 (State Clearinghouse Number 2014011009).

Project Information

 

PROJECT SUMMARY: The County of Riverside Planning Department will serve as the Lead Agency under the California Environmental Quality Act (CEQA) and will coordinate the public review of a Recirculated Draft Environmental Impact Report (RDEIR) that will evaluate the potential significant environmental impacts that may result from the proposed project. TSG Cherry Valley, LP (project proponent) is proposing to process the above referenced entitlement actions through Riverside County in order to develop PP 25337 which is an industrial distribution facility consisting of two industrial buildings totaling 1,823,760 square feet, with 306 bay doors 30,000 square feet of office space, located on 229 gross acres, of which approximately 140.23 acres would be included within the developed portion of the project, and 84.8 acres would remain as natural open space (approximately 36 percent of the project site).. The proposed GPA would revise the land use designation from Community Development: Very Low Density Residential (CD:VLDR)(1 Acre Minimum) and Rural: Rural Mountainous (R:RM)(10 Acre Minimum) to Community Development:  Light Industrial (CD:LI)(0.25 – 0.60 Floor Area Ratio) Community Development: Public Facility (CD:PF) and Open Space: Open Space Recreation (OS:OS-R) and Rural: Rural Mountainous (R:RM) (10 Acre Minimum).  The Change of Zone proposes to change the existing zoning from Controlled Development Areas (W-2) to Industrial Park (I-P).  The Parcel Map proposes to subdivide 229 gross acres into four parcels. The property is located northerly of Cherry Valley Boulevard, easterly of Interstate 10 and westerly of Vineland Street, within the Cherry Valley Policy Area, Cherry Valley Gateway Policy Area and the Pass Area Plan. APNs 407-220-004, 007, 008, 009, 014, 016, 017, and APNs 407-270-012,407-270-013 are not part of the project, but are part of improvements related to the project. 

 PROJECT LOCATION: The property is located northerly of Cherry Valley Boulevard, easterly of Interstate 10 and westerly of Vineland Street, within the Cherry Valley Policy Area, Cherry Valley Gateway Policy Area and the Pass Area Plan. 

Contact Information

 

Brett Dawson, Project Planner
Riverside County Planning Department
4080 Lemon St., 12th Floor
Riverside, CA  92501
(951) 955-0972

BDawson@rivco.org

Recirculated Draft EIR Documents (PDF)


EIR Title Page

EIR Table of Contents
EIR Acronyms
EIR Executive Summary
Section 1.00 - Introduction
Section 2.00 - Project Description
Section 3.00 - Environmental Impact Analysis
Section 3.01 - Aesthetics
Section 3.02 - Agriculture
Section 3.03 - Air Quality
Section 3.04 - Biological Resources
Section 3.05 - Cultural Resources
Section 3.06 - Geology and Soils
Section 3.07 - Greenhouse Gas Emissions
Section 3.08 - Hazards and Hazardous Materials
Section 3.09 - Hydrology and Water Quality
Section 3.10 - Land Use and Planning
Section 3.11 - Mineral Resources
Section 3.12 - Noise
Section 3.13 - Population and Housing
Section 3.14 - Public Services
Section 3.15 - Recreation
Section 3.16 - Transportation and Traffic
Section 3.17 - Utilities and Service Systems
Section 4.00 - Cumulative Impact Analysis
Section 5.00 - Other CEQA Considerations
Section 6.00 - Alternatives to the Proposed Project
Section 7.00 - Persons and Organizations Consulted
Section 8.00 - List of Preparers
Section 9.00 - References

Recirculated Draft EIR Technical Appendices


Appendix Title Page
Appendix Table of Contents
Appendix A - Notice of Preparation
Appendix B - Air Quality and Greenhouse Gases
Appendix C - Biological Resources
Appendix D - Cultural Resources
Appendix E - Geology and Soils
Appendix F - Phase I Environmental Site Assessment
Appendix G - Hydrology and Water Quality
Appendix H - Noise
Appendix I - Traffic Study
Appendix J - Fiscal Impact Analysis

Appendix K - Comparison of 2003 and 2015 General Plans

Economic Impact

Final EIR


Final EIR Responses to Comments