Sorry, you need to enable JavaScript to visit this website.

NOP for Majestic Freeway Business Center Phase II EIR

NOP for Majestic Freeway Business Center Phase II EIR - Comment Period: August 3, 2022 to September 2, 2022

Notice of Preparation for Environmental Impact Report Number 

A Notice of Preparation (NOP) for an Environmental Impact Report for Majestic Freeway Business Center Phase II which includes Plot Plan No. 220003 (PPT220003/Building 18) Plot Plan No. 220008 (PPT220008/Building 13), Plot Plan No. 220009 (PPT220009/Building 17), and Plot Plan No. 220015 (PPT220015/ Buildings 14A and 14B)

Comment Period

The comment period for the Notice of Preparation is from August 3, 2022 through September 2, 2022. 

Pursuant to CEQA Section 15063(a) when an EIR is clearly required for a project an initial study is not required. As such, an initial study was not prepared prior to this NOP.

A Scoping Session is to be held on August 29, 2022 at 1:30 with the Director’s Hearing meeting. Please see the below link for accessing the meeting.

https://planning.rctlma.org/Public-Hearings/Directors-Hearing/2022-Directors-Hearing-Meetings

Project Information

PROJECT DESCRIPTION: 

The proposed Project consists of applications for four separate plot plans (Plot Plans PPT220003, PPT220008, PPT220009, and PPT220015) to entitle five light industrial buildings for development with 1,219,222 square feet (s.f.) of total building area on a total of 67.86 gross acres within the Mead Valley community of unincorporated Riverside County. Building 13 (PPT220008) is proposed on an 18.34-acre property located at the northwest corner of Martin Street and Harvill Avenue and would include a 307,616 s.f. building with a total of 54 docking doors along the western façade of the building. Buildings 14A and 14B (PPT220015) are proposed on a 20.35-acre property located at the northwest corner of Perry Street and Harvill Avenue and would include a total of 337,698 s.f. of building area. Building 14A is proposed in the western portion of the site and would include a 200,624 s.f. building with 27 docking doors along the eastern façade of the building. Building 14B is proposed in the eastern portion of the site and would include a 137,074 s.f. building with 21 docking doors along the eastern façade of the building. Building 17 (PPT220009) is proposed on a 15.78-acre property located at the northeast corner of Harvill Avenue and America’s Tire Drive and would include a 256,148 s.f. building with 39 docking doors along the southern building facade. Building 18 (PPT220003) is proposed on a 13.40-acre property located at the southwest corner of Peregrine Way and Harvill Avenue and would include a 317,760 s.f. building (217,136 s.f. ground floor space and 100,624 s.f. of mezzanine space) with a total of 39 docking doors along the western building façade.

PROJECT LOCATION: The overall project is located south of Oleander Avenue, west of I-215 Freeway, north of Martin Street, and east of Decker Road. Each Plot Plan’s location is noted below.

PPT220003/Building 18: Southwest corner of Peregrine Way and Harvill Avenue

PPT220008/Building 13: Northwest corner of Martin Street and Harvill Avenue

PPT220009/Building 17: Northeast corner of Harvill Avenue and America’s Tire Drive

PPT220015/Buildings 14A and 14B: Northwest corner of Perry Street and Harvill Avenue.

Contact Information

Any comments for the NOP should be addressed to Russell Brady at the address and/or email address below. If there are any questions please call or email.

Russell Brady, Project Planner
Riverside County Planning Department
4080 Lemon St., 12th Floor
Riverside, CA  92501
(951) 955-3025

[email protected]